By Terry Murry on Sunday, November 8th, 2026 in Columbia Basin News More Top Stories
BOARDMAN – The Oregon Department of Transportation starts work on Interstate 84 that will mean rolling slowdowns Monday and possibly Tuesday with delays lasting through the week as they work on the Boardman to Hemingway transmission lines.
First the crews are installing overhead transmission line crossings at milepost 168 and U.S. 730 near Bombing Range Road. Flaggers will control traffic during the rolling slowdown. There could be up to five rolling slowdowns during this period.
During each rolling slowdown, traffic control vehicles will slow approaching traffic to create a 10-minute gap with no vehicles passing through the work area. This allows crews to safely move the ropes across the highway and attach them to the transmission towers without traffic passing beneath the work. Depending on what’s accomplished Monday, there could be more slowdowns Tuesday.
Otherwise, once the ropes are installed, the workers will transition to lane closures through Friday while they pull the new electrical transmission lines into place. Speed limits will be reduced during the lane closures and trucks will be positioned to help prevent the lines from reaching the highway during installation.
ODOT has positioned portable message signs to alert travelers of the work. Officials suggest motorists to plan for delays, watch for traffic control crews, and use caution when traveling through the area.